Node of classification on Mokrynskiy a granite quarry in the Zaporozhye region
Constructions ' manufacturing and installation of conveyor bridges and pipelines with a device of the foundations and networks of external sewage system node of classification on Mokrynskiy a granite quarry in the Zaporozhye region.
Design features:
- Foundations of the pipeline trestle - single and dual monolithic reinforced concrete foundations on compacted soil pillow;
- Foundations for equipment - individual reinforced concrete foundations for equipment, according to the tasks of manufacturers of the equipment;
- Conveyor flyover and conveyor - individual metal structures;
- A network of external sewage system - modular ferro-concrete.
Completed:
- Development of drawings KMD;
- Preparation of ground for foundations, including the replacement and compaction of soils;
- The device of ferro-concrete foundations pipeline trestles with hydro insulation;
- The device of the bases under the equipment;
- Network device of external sewage system;
- Manufacturing and installation of metal structures conveyor racks and racks of conveyor equipment (suspended and driving drums);
- Installation of belt conveyors, 3 pieces of a total length of more than 100 meters;
- Installation of the enclosing constructions for the conveyor bridges and stretch drums.
The General term of performance of works - 4 months in the winter (November 2011 and February 2012).