Project work of reconstruction with extension of non-residential premises for the manufacture of metal and plastic products, Brovary
|
The reconstruction project
|
|
|
Strenghtening of soil foundations
|
|
Reconstruction with extension of non-residential premises for the manufacture of metal and plastic products, Brovary
► Objectives, solved during the project:
-
Extension of existing non-residential premises for the manufacture of metal and plastic products through superstructure of technical floor and two office floors with adding of two stair-lift sections;
-
Increasing of production capacity of workshops for production of metal and plastic product;
-
Reception of additional source of income by leasing the unused area;
-
A significant increase in the object’s value (in case of subsequent sale) by extending functionality and applicability.
► Constructional features of the existing building:
-
An existing building is a single-storey building of the former manufactured product store;
-
Base bearing capacity is not sufficient for the future object loads;
-
foundations are concrete strip foundations of the blocks;
-
walls and roof are constructed from concrete reinforced enclosures on prefabricated concrete reinforced frame;
-
floors are mosaic concrete floors.
► There are completed:
-
The project of foundation base fastening;
-
Fixing of base soil foundation of the workshop building, followed by their laboratory tests;
-
Development of conceptual design, project stage "P" (draft), documentation;
-
A comprehensive project assessment and receipt of positive expert report.
The general term of design and fastening foundation base is 5 months.