WP for the construction of a mixed preparation department

Working Project for the construction of a mixed preparation department

 

Done

  • Technical inspection of building structures, technological equipment and engineering networks at the installation site of the EIRICH sand molding machine.
  • Development of working drawings for the disassembly of building structures, taking into account the geometric parameters and technological layouts of the installation of the molding sand preparation machine and molding machine.
  • Calculation of parameters and design of reinforcement of structural units in the disassembly areas in accordance with the current DBN.
  • Development of the design and calculation of building structures (foundations) for installation of the preparation sand molding machine and DIZA Match32x32 molding machine, taking into account the results of engineering and geological surveys at the site of operations, technical inspection of the condition of the existing foundations of columns, thermo-stove and casting conveyor and data of passports for the equipment to be installed.
  • Development of working draft of exhaust ventilation from the molding machine DIZA Match32Ñ…32.

Features

  • Interpretation of technical solutions of the foreign company EIRICH for Ukrainian standards
  • Additional collection of all source data

Terms of works: 3 months.

 

Private enterprise firm "MLAD"
49024, Dnepropetrovsk,
Universalna st., 10
tel. +38 (056) 370-59-87
tel.\ fax. +38 (056) 370-59-86