Working project of the warehouse of finished products of the dairy plant with an administrative and household complex for the staff and a charger for 20 batteries
		
		   According to the design task (main requirements):   1. The annual production program according to the range of products to be stored in the warehouse under construction consists of: milk — 20,508 tons; yogurt - 31,032 tons; kefir - 5440 tons; Ryazhenka - 2655 tons; cream - 150 tons;   2. In the warehouse under construction, a constant annual temperature regime within the warehouse zones is ensured, which is equal to +4±2ºС;   3. The cargo formation zone (expedition zone) on pallets is determined based on the calculation of 163 pallet spaces;   4. The number of pallet spaces in the warehouse for permanent storage on racks is 1,092 pallets, and the geometric parameters of the pallets are 1,200 x 1,000 x 1,575 mm;   5. The mode of operation of the enterprise - 2 (two) variable continuous;   6. Estimated area of the warehouse - 1330 m2.   Done:   1. Geological research and geodetic searches;   2. The town planning rationale was developed;   3. The working project was developed with three-stage design: stage PP - pre-project studies; stage P - project; RD stage - working documentation for the following sections of the project:   ТХ — technological solutions;   AR — architectural solutions;   GP — general plan and transport;   KZ — reinforced concrete structures;   KM — metal structures;   ОВ — heating and ventilation;   VC — water supply and sewerage;   PV — fire water pipe;   ХЗ (АХЗ) — cooling system (automatic cooling system);   ETR — electrical engineering solutions;   PS — fire alarm system;   OS — security alarm system;   VN — video surveillance (video surveillance);   SCM — structured cable (computer) networks;   PT — fire extinguishing (including automatic fire extinguishing installations) splinker;   APT, APDZ, APV, etc. - automation of fire and smoke protection systems;   BZ — lightning protection;   VZM — fire protection of metal;   ЗГЗ — external gas supply (removal of the gas pipeline) with obtaining the relevant technical conditions;   ZEM — external electrical networks;   ZVK — external water supply and sewerage (removal of storm sewerage);   EIA — environmental impact assessment;   ZPZ — general explanatory note;   KD — estimate documentation;   POB is a construction organization project
 









 
                   